← All courses

Stochastic Models

2026

Course Snapshot

Institution
HKUST, Department of Industrial Engineering and Decision Analytics
Period
2026
Audience
Undergraduate engineering students.

In Fall 2026, IEDA3250 introduced stochastic processes in discrete and continuous time. Students used Markov chains and Poisson processes to predict the timing of events and study long-run behavior. Queueing and inventory models showed how variability affects waiting times and stock levels. Markov decision processes brought decisions into the model by linking actions taken today to future costs and rewards.

Learning Outcomes

  • Choose a state and use Markov chains to calculate transition probabilities, hitting times, and long-run behavior.
  • Use a Poisson process to predict how many arrivals occur in an interval and how long it takes for the next one to arrive.
  • Estimate queue lengths and waiting times, and compare the effects of pooling servers or limiting capacity.
  • Choose and evaluate inventory policies when demand is uncertain and replenishment takes time.
  • Use Bellman equations to choose an action for each state in a Markov decision process.

Materials

PDF

Fall 2026 lecture notes

All seven chapters and six appendices, including proofs, worked calculations, and reference material.

Open course notes (PDF)
CH1

Introduction

Use a canteen queue to identify the system state, describe how it changes, and choose a measure of performance.

Open Chapter 1
CH2

Markov Chains

Forecast transitions over several steps, find the time to reach a target, and calculate long-run state probabilities.

Open Chapter 2
CH3

Poisson Processes

Calculate arrival counts and waiting times, then see what happens when arrival streams are combined or split.

Open Chapter 3
CH4

Continuous-Time Markov Chains

Build a model from transition rates and use flow balance to analyze birth-and-death processes.

Open Chapter 4
CH5

Queueing

Relate queue length to waiting time with Little’s law and compare systems with limited capacity, pooled servers, or variable service times.

Open Chapter 5
CH6

Stochastic Inventory Models

Start with a single stocking decision, then examine how order costs and delivery lead times affect replenishment.

Open Chapter 6
CH7

Markov Decision Processes

Use dynamic programming to choose actions over a finite horizon or maximize discounted rewards over an infinite horizon.

Open Chapter 7
Top ↑